Tuesday, December 10, 2013

Paying off Debt



Most of us have loans of some kind.   The type of loan may be for a car or the mortgage on your house.  Cities are no different.  Cities take out loans called bonds to finance things like roads and sewer improvements.  Some of these are repaid by assessments from property owners.  Some are paid by taxes and sometimes a portion is paid by an enterprise fund like the sewer fund.  In Breezy Point we have bonds that are paid with various approaches using one or all three of these revenue sources. 
 
In managing debt instruments the city has a specific fund that addresses only debt.  All revenues received go into this fund.  All bond payments come from this fund.  Each bond carries its own payment schedule.  Revenues are budgeted annually from anticipated assessment income and tax levy.  If the bonds had a sewer payment component, a percentage of the amount of debt service required, is paid annually to the debt service fund. 
  
Bonds are structured so they are paid off over the course of many years.  Typically bonds will mature in 15 or 20 years with annual payments made to retire the debt.  They also have a “call” feature.  Typically about half way through the term of the bond there is an opportunity to pay it off.  This is called an early redemption.  This call feature provides for some flexibility in debt service management.  If the bonds can be refinanced to take advantage of a lower interest rate they can be called and new bonds issued.  The bonds could also be restructured at call to extend the term with a new bond.  The call also allows the payoff of a bond if funds are available. 

The city has two outstanding bonds that have met their call date.  The debt service fund had adequate resources to pay off at least one on these bonds.  There is a good deal of interest savings available if they are paid off early.  Paying off both bonds has been a goal.

Some of the outstanding bonds the city holds require an annual sewer contribution.  This contribution extends through the life of the bonds, essentially owing the debt service fund revenues for bond payments.  It was felt that if these funds were prepaid to the debt service fund, both bonds could be paid off. 

After accomplishing a cash flow analysis on all outstanding debt, several approaches were developed to address the early payoff off the two bonds.  The differences in these approaches were the dates of redemption and how sewer payments would be received.  Each approach saved a considerable amount of interest with an early payoff of them.  Each approach also freed up additional resources as revenues previously used for debt service can be used elsewhere.  From a very simple perspective the sooner the bonds are paid the more the interest savings.  With that in mind the use of owed sewer funds became an important component in providing for a payoff.  

To make a long story short the owed sewer funds will be prepaid to the debt service fund.  This makes adequate resources available to pay off the bonds.  The City Council approved the early redemption of the 2005 and 2008 bonds.  They will be paid off in February, thus reducing the number of outstanding bonds to one. 

Thursday, December 5, 2013

2014 Budget and Levy



The Breezy Point City Council adopted the levy and budget for 2014.  The levy, after being reduced or held flat over the past 4 years, was increased $34,000 for 2014.  This represents a 1.94% increase.  The budget continues to be rather frugal.  As we look at budget to actual figures for 2013 we’re finding it difficult to maintain certain line items at budget as costs have increased and needs don’t go away.  The bottom line for 2013 should show we’re slightly under budget but there was little room for finding continued savings.
 
For 2014 the total levy for the city is $1,753,000.  This levy includes a reduction in debt service of almost $70,000.  It also saw a reduction in the cemetery levy of $2,000. Areas where increases in expenditures were shown were a cost of living increase of 2 percent and increases in employee health insurance costs.  The largest line item increase was for road improvements moving from $25,000 to $91,000.  This increase is for an overlay to Breezy Point Drive and some seal coating of roadways.  These are really deferred maintenance.  A replacement public works truck will be acquired and an annual replacement of a squad car.  Both of these expenditures have a significant portion of the costs funded in prior years.  Dust control will see an increase of 10%. 

The debt service levy was substantially reduced.  This was accomplished by several actions to allow for that change.  A refunding was accomplished on two bonds which reduce the annual debt service requirement.  For 2014 that saves approximately $8,000.  The remaining bonds were anticipated to be called allowing for that debt levy to be removed from the budget.  Finally, some debt service obligation was assumed by the debt service fund balance.  Going forward into 2015 the debt levy obligation will remain at $200,000 while for 2014 the total levy amount was $202,390.  Making these changes was a goal of the city for a number of years.  Timing became the key as bonds could not be paid off until the call date was reached. 
 
Successes with the budget were achieved this year but not without a good deal of hard work.  The city, much like other jurisdictions, has seen taxable values decline.  With the flat or reduced levies that occurred over the past 4 years the city had in the past found economies in operations and with delayed actions.  Some of these actions could no longer be delayed.  New economies are hard to find and the demands of the public are always on the rise.  I feel the outcome was fiscally responsible while making some headway with moving forward.

Tuesday, December 3, 2013

First Snow!



The first snow of the year seems to be very trying on most people.  You would think, hey, we’re from Minnesota, we know about this stuff.  We all forget about some of it.  We need to learn to drive in the stuff, again.  That means no erratic changes in direction, slow acceleration and giving yourself plenty of time to slow down and stop.  

Then there is snow removal.  Walkways and driveways get attention from property owners.  Streets get attention from the public works crew.  Their plowing skills are a bit rusty but like riding a bike they don’t forget how it is done.
  
But the first snow of the season has its special challenges.  The edges of roadways don’t have the definitions they had without snow.  Snow blurs the lines with the blanket of white.    With the first snow the applications of salt and sand haven’t been seen in 6 or more months making it a bit more difficult to scrape the road efficiently.  With applications of salt and sand from a previous snow event, the process of removal becomes easier to accommodate.  In addition, without the sand or salt residual, traction can be a problem.  This effects not only vehicles moving around but also the snow plows.  The first snow seems to always be wet and heavy.  Temperatures are such that the snow carries a lot of moisture and therefore weight.  Great snow ball or snowman snow!  Kids like it but plow drivers get frustrated.  Traction becomes an issue.  Weight of the snow off the plow becomes an issue and the time it takes also becomes an issue.  Often time the weight of the snow coming off the plow can cause damage to mailboxes. 

As winter progresses, we maintain a residual of salt sand on the roads.  The temperatures get colder and the snows lose their high moisture content.  Snows are lighter in weight.  The plows move with greater speed and efficiency.  Road boundaries are well defined from previous snow events and the plow drivers find their groove.  

The drama of the first snow easies as we all remember (or learn) how to deal with these things, these snow events, and the concept that we may have to wait to get plowed out.  With 62 miles of roadway in the city and 5 personnel doing the work it can take some time to get it all done.  Most residents understand but some new residents think it should be done like they do in the metro area.  The resources aren’t here to do that.  The first snow always carries its problems and patience isn’t always there for those who expect results.  A wet large snow fall as the first event of the year is always the hardest for all of us to accept.  Its winter!

Friday, November 8, 2013

Whitebirch Village



The first steps for an improvement project have been undertaken for the development of Whitebirch Village and Creek Circle.  Whitebirch Village is proposed as a development for “Active Adults” to be located abutting Whitebirch Drive and the Whitebirch Golf Course.  The first phase of the development will include 18 units in twin homes. 

This project was petitioned for by Whitebirch, Inc. and a couple of abutting property owners.  Working together in a project of this size brings some economy of scale to the project.  The approach used also recognizes the economy generated by sharing the costs.  Without these benefits the cost of improvement would be greater making it difficult to manage. 

Paving of a portion of Whitebirch Drive and Creek Circle is part of the proposed project.  It is anticipated that pavement will be continued from the area where pavement stops near Antlers restaurant to a point approximately half way between Creek Circle and Papago Circle on Whitebirch Drive.  

Sanitary Sewer is anticipated along the same stretch of the roadway that will be paved.  It will also extend across the fairway of the golf course to a lift station along Co. Rd. 11.  This will provide for gravity sewer for the entire project.  

What this first step entails is the ordering of a feasibility study concerning the project as outlined and the associated costs.  The costs would be listed by type of improvement and the projected totals would be used to determine a proposed assessment for the project.  It is anticipated that an open house would be held in which the public is invited to attend to better understand the proposed improvements.  The next step in the process is a public hearing.   Affected property owners are invited to hear about the project.  At the hearing those interested are invited to present their view of the improvement to the city council.  Considering the views of the property owners will determine how the project will proceed.

Wednesday, October 30, 2013

What's public works up to?



Do you ever wonder what goes on this time of year with public works?  The mowing is done.  Parks are closed for the season and road construction comes to a near halt.  What you may not think about is the large amount of preparation that is accomplished with the change of seasons. 

To start with, road construction season really doesn’t come to an end until much later in the season.  Starting with paved roads they need to make sure the potholes have been filled.  The manholes in areas with sewers need to be reviewed and if they are showing above the pavement they need to be shaped with asphalt to prevent plows hitting them.  Believe it or not the roads move up and down while manholes stay in place.  The shifting creates these differences in elevation.  With gravel roads they also need to be shaped to provide for plowing.  Surfaces need to be level and areas of erosion checked and satisfied.  Plowing of gravel roads is a bit tricky in that the roads need to freeze up before plows are used so as not to remove the surface materials.  

Moving on to equipment there are also lots of little things that are done in preparation for the plowing season.  Trucks are gone through and repairs made.   Trucks used for hauling gravel need to be repurposed to plowing.  That means plows are installed.  On the larger trucks that means three plows; a belly plow, front plow and wing.  With each plow cutting blades need to be checked and swapped if required.  Each truck is also fitted with sanding and brine dispersal equipment.  

Speaking of Brine?  What is this?  As a means to minimize the use of salt and to provide for better winter road maintenance the city now uses brine on the roadways.  Brine is a saltwater mixture that is used in certain situations.  Perhaps you have seen on the roadway what appears to be a stripe of water prior to a winter storm.  Brine is sprayed on the roadway to pretreat the surface to minimize the adhesion of snow and ice.  This allows for faster plowing and cleaner roadways.  Some times with limited snow falls it eliminates the need to plow in early parts of the season.  Brine is just one tool and used when conditions allow, it is not just used for pretreatment.  By the way the city makes its brine for use and that too involves time in preparation, mixing salt and water meeting the right concentration to be effective. 

Another tool in the winter arsenal is sand and salt sand.  Sand needs to be hauled from the pits and ready and available for use when needed.  Many loads of sand are made available for public works use.  Salt sand is another tool that requires preparation and forethought.  We typically haul in a semi-trailer of salt in the fall that was ordered in early summer.  Sand is then mixed with the salt and stored for winter use.  This is done onsite with the loader and accomplished a little at a time. 

Anticipation, preparation and forethought are all needed to gear up for winter.  Planning ahead for the season is necessary and time consuming but it is all worth it when the snow files and people need to get to work or the grocery store.  This may be expected but a lot goes into the process of managing winter.